Skip to content

Weld it. Scan it. Track it.

Connect the work.Trace the evidence.Trust the result.

Bring welding, fabrication, QA/QC, NDE, specifications, reporting and turnover into one connected project record. Built for the people doing the work—and the people who need to trust it.

Built around real work. Connected by ExactTrac.

One record. A connected story.

W-1027

DrawingISO-1042
WeldWPS-101 · Welder 014
QualityVT + RT evidence
TurnoverDEMO-TOP-001
Explore weld management

Illustrative project data

Welding. Quality. Evidence. Connected.

Scroll to explore

The ExactTrac platform

One connected workflow.
Every stage accounted for.

From project setup to an asset's ongoing record, keep the work and its evidence connected.

  1. 01

    Set up

    Bring the team, job information and access together.

  2. 02

    Plan

    Connect requirements, specifications and inspection plans.

  3. 03

    Fabricate

    Link spools, welds, procedures and field records.

  4. 04

    Verify

    Follow inspections, testing and supporting evidence.

  5. 05

    Turn over

    Review the records and prepare the handover package.

  6. 06

    Retain

    Keep completed work connected to the asset history.

Every stage supported. Every record connected.

Explore the 14 work areas behind the workflow.

Explore all features
SP-014 / Illustrative tag

QR tags / A connection at the spool

Scan the spool. Open the context.

Attach a QR code tag to a spool and give the team a direct path to its connected job information. A phone scan brings the spool into context—without starting a search from scratch.

  • Connect a physical spool to its job and spool record.
  • Find relevant drawings, specifications, notes and available turnover information.
  • Keep field, shop and office teams connected through the same tag.

Available information follows project sharing settings and user access.

Explore weld management
Connected recordSample data
Spool
SP-014
Job
North Ridge Demo
Drawing
ISO-1042
Connected context
Job notes · spool notes · photos
Illustrative tagged spool

Job & spool notes / Keep the team informed

The next scan should tell the whole story.

Share a note across the job or attach it to one spool. Add photos to show the detail, record a field observation or explain what the next person needs to know. Keep that information connected to the work.

  • Job notes carry information relevant to the wider project.
  • Spool notes keep specific observations with the right spool.
  • Uploaded images provide visual context alongside the written note.

Authorized users can review the latest shared notes and photos when they scan. Notes add context to project drawings and specifications.

Watch the workflow in action
Fictional example

North Ridge Demo / All spools

Keep the project instructions in view.

Review the issued drawing and shared project instructions before starting the next activity.

project-reference.jpg

Information shared across the job

Fictional example

North Ridge Demo / SP-014

Show the detail on this spool.

Identification and fit-up reference photos are attached to SP-014. Review the images with the note and raise any open questions with the project team.

spool-identification.jpg
fit-up-reference.jpg

Photos and observations linked to one spool

Built around your team

Different responsibilities.
The same project story.

Connect the people building the project with the people inspecting, managing and handing it over.

Field & fabrication

Keep the drawing, the weld and the field record connected as work moves from shop to site.

Quality teams

Follow requirements, inspections and NDE evidence without losing the project context.

Project leadership

Bring progress, outstanding work and turnover evidence into the same conversation.

Watch the platform at work

See ExactTrac in action.

Watch the project workflow from field records through reporting and turnover.

Use the video controls for sound, seeking and fullscreen.

Open video

Confidence starts with control

The right context.
The right access.

Project evidence deserves a considered approach to access and accountability. Explore how ExactTrac fits your team's roles, review process and documentation requirements.

User & project accessEvidence traceabilityReview & handover
Discuss your security requirements

Beyond turnover / A living asset record

The job ends. The asset story keeps growing.

Turn completed work into a living database of information for your facilities and field sites. Keep turnover records connected to the assets they belong to, so the next team can find the history behind the work.

Facility / Process area

Process area

The installation is complete. Its drawings, weld records and inspection evidence remain part of the facility story.

Completed job
Process piping installation
Turnover record
DEMO-TOP-101

Connected information

  • Issued drawings
  • Weld & NDE records
  • Turnover package

A starting point for maintenance planning and the next project.

Facility / Tank farm

Tank farm

The tie-in is complete. Keep its drawings, inspection reports and supporting notes connected to this area of the facility.

Completed job
Tank farm tie-in
Turnover record
DEMO-TOP-102

Connected information

  • Tie-in drawings
  • Inspection reports
  • Job notes & photos

Context for future modifications and scope reviews.

Facility / Utilities

Utilities area

The installed utility spools remain connected to their specifications, job history and completed turnover package.

Completed job
Utility spool installation
Turnover record
DEMO-TOP-103

Connected information

  • Spool history
  • Specifications
  • Turnover package

Connected records for field, office and owner teams.

Facility / Loading area

Loading area

The replacement is complete. Its drawings, quality evidence and photos provide context for the next team working here.

Completed job
Loading line replacement
Turnover record
DEMO-TOP-104

Connected information

  • Replacement drawings
  • QA/QC evidence
  • Supporting photos

An accessible project history for the next handover.

Completed jobs. Connected evidence. A more informed next step.

Connect your asset history

Photo: Carol M. Highsmith / Library of Congress

Illustrative callouts and fictional job packs. Record availability follows project sharing, user access and agreed retention arrangements.

Take the next step

Start with a sample.
Picture your next project.

Explore the platform

Explore the connected work areas.

Explore 14 work areas and their connected sample records. No account needed. The feature library uses illustrative data; changes are not saved.

Open feature library

Your team. Your requirements.

Talk through a live project.

Walk through your scope, quality process and turnover expectations with us. Discuss a guided evaluation using the workflows that matter to your team.

Discuss your project